Under Ground Cables (UGC)
Overview:
MAZZED provide expertise in electrical / civil engineers with extensive experience for all EHV / HV UGC work to design complete work, BOQ and material list and produce base & detail design drawing a professional manner as per SEC standard & international codes.
Scope of Work
- Cable pulling tension and sidewall pressure calculations.
- Key plan of power cable route.
- Cross Section of Direct Buried cable trench, road crossing duct bank.
- 33kV Cable Schematic & Interconnection Diagram.
- Fiber Optic Cables Route.
- Communication Handhole plan & details.
- Communication Handhole location plan.
- Cable trench & Duct bank (drawings & Calculation)
- Cable trench & Duct bank with road crossings